Covanta Energy Inc.
August 2, 2017
BY Erin Krueger
Advertisement
Advertisement
3i Infrastructure plc on Oct. 26 announced that Future Biogas has acquired the remaining 49% stake in a portfolio of six gas-to-grid AD facilities from Foresight Environmental Infrastructure Ltd. for £104 million.
The U.K. Department for Energy Security and Net Zero on Sept. 29 released data showing that total energy production from bioenergy and waste sources fell by 3.4% during the second quarter of 2026 when compared to the same period of 2025.
Toyota Motor Europe on Oct. 1 announced an anaerobic digester located adjacent to its U.K. engine plant in Deeside, North Wales, has begun operations. The biogas project is enabling carbon-neutral manufacturing at Toyota’s facility.
Carbon Neutral Fuels has unveiled “FlexSAF,” a flexible plant design that enables the production of both eSAF and advanced bioSAF at a single facility. The design will debut at CNF’s flagship Project Starling site in the U.K.
Drax on Sept. 30 introduced a new interactive map feature for its Biomass Tracker tool that visualizes the journey that sustainably sourced woody biomass takes through the company’s global supply chain.