
From manure to energy and valuable nutrients: 130,000 metric tons of manure per year will be transformed into 360,000 GJ of RNG at a Taurus RNG facility constructed on site at the Kasko Home Lot in Coaldale, Alberta. / SOURCE: Taurus RNG
February 17, 2026
BY Taurus Canada Renewable Natural Gas Corp.
Advertisement
Advertisement
Aemetis Inc. announced on Oct. 22 that its Aemetis Biogas subsidiary has completed construction and started operation of two additional dairy biogas digesters as part of the company’s biogas production network.
Neela Biotech, the Cambridge-based biotech startup turning waste into SAF, on Oct. 8 announced it has raised £2.1 million in pre-seed funding to take its technology from the lab to a pilot-scale trial at a biogas plant over the next two years.
The U.K. Department for Energy Security and Net Zero on Sept. 29 released data showing that total energy production from bioenergy and waste sources fell by 3.4% during the second quarter of 2026 when compared to the same period of 2025.
CCI BioEnergy and Fairfield-Suisun Sewer District have signed a term sheet to advance the development of a new organics receiving and processing facility at FSSD's wastewater treatment plant in Fairfield, California.
Toyota Motor Europe on Oct. 1 announced an anaerobic digester located adjacent to its U.K. engine plant in Deeside, North Wales, has begun operations. The biogas project is enabling carbon-neutral manufacturing at Toyota’s facility.