SECTIONS

HomeArticlesPodcastsJobs

Fond du Lac Band of Lake Superior Chippewa completes $3.1 million biomass energy project

The biomass heating system facility for the Brookston Community Center was designed and constructed through a collaborative effort involving Tribal leadership, engineers, and local contractors. / Photo from Joshua Gregory, Office of Indian Energy

February 26, 2026

BY U.S. Department of Energy Office of Indian Energy

Advertisement

Advertisement

Related Stories

Kent collaborates on Pre-FEED study for Eq.flight demonstration plant

Article image

By Kent

8 hours ago

Sustainable Aviation Fuels Business 

Kent, a global integrated energy services partner, is delivering the pre-front-end engineering design (pre-FEED) for Eq.flight, an advanced power-to-liquids (PtL) sustainable aviation fuel (SAF) demonstration plant.

Read More

U.S. EPA Assistant Administrator for Air and Radiation Aaron Szabo on Feb. 25 announced the agency has submitted the long-awaited rule to set 2026 and 2027 RFS RVOs to the White House Office of Management and Budget.

Read More

Clean Energy Fuels Corp. released fourth quarter financial results on Feb. 24, reporting the company sold 64.1 million gallons of renewable natural gas (RNG) during the period, up 3.4% when compared to the fourth quarter of 2024.

Read More

Calgren has completed construction of its first direct-to-consumer renewable compressed natural gas (R-CNG) fueling station. Located in Pixley, California, the new station allows drivers to fuel their compatible vehicles with locally produced RNG.

Read More

Carbon Direct and C2X have announced a new collaboration to advance the Beaver Lake Biofuels project in Louisiana. This project will transform forestry residues and by-products into both clean fuel and high-quality CO2 removal credits.

Read More

Upcoming Events

Sign up for our e-newsletter!
BBI International Logo

@ Copyright 2026 - BBI International - All rights reserved.